Isolabona, House in the center!

Ref. code: 14209
Townhouse in the center of Isolabona!

A unique opportunity to purchase a home in the heart of the picturesque historic village of Isolabona, in Liguria, Italy. An authentic setting, characterized by charming Italian alleyways, historic architecture, and a peaceful atmosphere, ideal both as a primary residence and as an investment for vacation rentals.

The property spans two floors connected by an internal staircase, with a total floor area of approximately 50 m². According to the property records, the property is zoned for residential use, allowing you to establish it as your primary residence or use it as a vacation home.

The location is excellent: two large free public parking lots, shops, cafés, and a public transit stop are all nearby, and the sea, with the beaches of the Ligurian Riviera, is only about a 20-minute drive away.

A renovation plan has already been drawn up by an architect, which calls for:
on the ground floor—a living room with a kitchen and a half-bath;
on the first floor—a bedroom with an en suite bathroom.

Water and electricity can be easily connected, as the neighboring houses are already connected to all necessary utilities.
Isolabona is a charming Ligurian village rich in history, surrounded by green hills and olive groves. The region is famous for its mild climate year-round, excellent Italian cuisine, proximity to the French Riviera, and high demand for vacation rentals.

An ideal solution for those who dream of a home in Italy with the opportunity to customize the interior to their own taste.

Other homes for sale in Isolabona

More details
  • Reference: 14209
  • Price: € 27.000
  • Heating: autonomous
  • Surface: sqm 50
  • Rooms: 1
  • Locals: 2
  • Rooms: bilocale
  • Distance from the sea: meters 9000
  • Total plans: 2
  • Floor: Ground floor
  • Exposure: double
Details
Characteristics of the area
Energy efficiency
  • Bedrooms: 1
  • MQ: 50
  • Bathrooms: 1
€ 27.000
Aquamarina Real Estate via Vittorio Emanuele, 302
18012 Bordighera (IM)
— Via Roma, 32
18038 Sanremo (IM)
— Phone: +39 0184 26.16.87
Mobile: +39 328 83.65.167
E-mail: info@aquamarina.email CALL REQUEST AN APPOINTMENT

CONTACT US

By submitting this form I confirm that I have read the privacy notice.

Request informations

Fill out the form

By submitting this form I confirm that I have read the privacy notice.

Chat Whatsapp Chat Whatsapp